Contract Number | Project Name | Project Description | Advertise Date | Anticipated Advertisement Date | Duration |
---|---|---|---|---|---|
X23PS01 | E Branch Accessibility and Infrastructure Improvements | Improvement project will upgrade the Green Line E Branch from Brigham Circle to Heath Street stations. Scope includes new accessible stations and station consolidation and the creation of a dedicated transitway for light rail and busses. Additional infrastructure upgrades in the scope include but are not limited to to traction power, overhead contact system, and track. | August 19, 2025 | June 2025 | 3 years |
TBD | South Boston Power Complex Study | Feasibility planning and concept development services for the South Boston Power Complex (SBPC) study, including renewals for the following SBPC assets: 115kV transmission lines; 15kV switching station equipment and facility; high voltage yard components; and 68 MW kerosene-fueled turbine-powered generator (two jet engines). This planning effort will also evaluate the feasibility of alternative scenarios at the site, such as battery storage and upgraded generation systems. | TBD | September 2025 | TBD |
TBA | Non-Brooks Act GECs | Quality Price Based Selection (QPBS) GECs that do not meet the requirement mandated in the Brooks Act. | TBD | September 2025 | 3 years |
TBA | Inner Belt Yard Expansion | Inner Belt Yard Expansion Project includes the design and construction of storage tracks for at least sixteen (16) Type 10 vehicles, a new MOW facility, site utilities, a crew parking area, and additional support appurtenances in an undeveloped parcel adjacent to the newly constructed Green Line Inner Belt Maintenance Facility and Yard. | TBD | October 2025 | TBD |
T25PS01 | Reservoir Lower Yard and Non-Revenue Track Optimization Project | Project will modify the yard track layout to accommodate new Green Line Type-10 vehicles. Project includes improvements to the site drainage system, new pavement markings, modifications to the overhead catenary system (OCS), new traction power feeds and improvements to the communications infrastructure. | TBD | October 2025 | TBD |