Future Professional Services Contract Bid Solicitations
The T is constantly working to upgrade facilities to better support riders.
All future and current solicitations are posted to our web site and are constantly updated to reflect the most recent information. You can find the summary for upcoming solicitations below.
Contract Number | Project Name | Project Description | Advertise Date | Anticipated Advertisement Date | Duration |
---|---|---|---|---|---|
V70PS05 | Engineering and Project Management Professional Services for Commuter Rail New Locomotive | Support the MBTA throughout the Car Builder selection process for Commuter Rail New Locomotive Procurement and attend stakeholder meetings, project meetings, site visits, and prepare meeting minutes including relevant evaluations and recommendations. | May 30, 2025 | May 2025 | 6 years |
Z91PS88-92 | Systemwide Transit Bus infrastructure Improvement Program | GECs to provide engineering 0-100% design, bid and CPS services to support systemwide infrastructure improvements aligned with Transit Bus projects and programs, such as bus stops accessibility improvements, bus network redesign, dedicated bus lanes, bus stop shelters and amenities, advanced transit signal priority and new technology, to improve systemwide network efficiency and user experience. | June 10, 2025 | June 2025 | 3 years |
P09PS01 | D-Branch Traction Power Upgrades for Increased Capacity | Upgrade the traction power infrastructure, overhead contact system (OCS), and underground communication systems along the D-Branch. These upgrades will support the future operation of double Type 10 vehicles and the communication network resiliency. | June 5, 2025 | June 2025 | 3 years |
X23PS01 | E Branch Accessibility and Infrastructure Improvements | Improvement project will upgrade the Green Line E Branch from Brigham Circle to Heath Street stations. Scope includes new accessible stations and station consolidation and the creation of a dedicated transitway for light rail and busses. Additional infrastructure upgrades in the scope include but are not limited to to traction power, overhead contact system, and track. | TBD | June 2025 | 3 years |
Y90PS01 | Systemwide Pump Room Upgrades Design | Provide design and engineering services for the Systemwide Pump Room Upgrades project. MBTA has identified the need to improve conditions at various pump rooms across the system by implementing improvements related to structural, electrical, architectural, and mechanical systems. | TBD | June 2025 | 3 years |
TBA | Non-Brooks Act GECs | Quality Price Based Selection (QPBS) GECs that do not meet the requirement mandated in the Brooks Act. | TBD | June 2025 | 3 years |
T25PS01 | Reservoir Lower Yard and Non-Revenue Track Optimization Project | Project will modify the yard track layout to accommodate new Green Line Type-10 vehicles. Project includes improvements to the site drainage system, new pavement markings, modifications to the overhead catenary system (OCS), new traction power feeds and improvements to the communications infrastructure. | TBD | July 2025 | TBD |
TBD | South Boston Power Complex Study | Feasibility planning and concept development services for the South Boston Power Complex (SBPC) study, including renewals for the following SBPC assets: 115kV transmission lines; 15kV switching station equipment and facility; high voltage yard components; and 68 MW kerosene-fueled turbine-powered generator (two jet engines). This planning effort will also evaluate the feasibility of alternative scenarios at the site, such as battery storage and upgraded generation systems. | TBD | July 2025 | TBD |