Bidding and Solicitations > Design & Construction > Future Projects

Future Professional Services Contract Bid Solicitations

The T is constantly working to upgrade facilities to better support riders.

All future and current solicitations are posted to our web site and are constantly updated to reflect the most recent information.  You can find the summary for upcoming solicitations below.

Contract NumberProject NameProject DescriptionAdvertise DateAnticipated Advertisement DateDuration
X23PS01E Branch Accessibility and Infrastructure ImprovementsImprovement project will upgrade the Green Line E Branch from Brigham Circle to Heath Street stations. Scope includes new accessible stations and station consolidation and the creation of a dedicated transitway for light rail and busses. Additional infrastructure upgrades in the scope include but are not limited to to traction power, overhead contact system, and track.August 19, 2025June 20253 years
TBDSouth Boston Power Complex StudyFeasibility planning and concept development services for the South Boston Power Complex (SBPC) study, including renewals for the following SBPC assets: 115kV transmission lines; 15kV switching station equipment and facility; high voltage yard components; and 68 MW kerosene-fueled turbine-powered generator (two jet engines). This planning effort will also evaluate the feasibility of alternative scenarios at the site, such as battery storage and upgraded generation systems.TBDSeptember 2025TBD
TBANon-Brooks Act GECsQuality Price Based Selection (QPBS) GECs that do not meet the requirement mandated in the Brooks Act.TBDSeptember 20253 years
TBAInner Belt Yard ExpansionInner Belt Yard Expansion Project includes the design and construction of storage tracks for at least sixteen (16) Type 10 vehicles, a new MOW facility, site utilities, a crew parking area, and additional support appurtenances in an undeveloped parcel adjacent to the newly constructed Green Line Inner Belt Maintenance Facility and Yard.TBDOctober 2025TBD
T25PS01Reservoir Lower Yard and Non-Revenue Track Optimization ProjectProject will modify the yard track layout to accommodate new Green Line Type-10 vehicles. Project includes improvements to the site drainage system, new pavement markings, modifications to the overhead catenary system (OCS), new traction power feeds and improvements to the communications infrastructure.TBDOctober 2025TBD

Related Links