Bidding and Solicitations > Design & Construction > Future Projects

Future Professional Services Contract Bid Solicitations

The T is constantly working to upgrade facilities to better support riders.

All future and current solicitations are posted to our web site and are constantly updated to reflect the most recent information.  You can find the summary for upcoming solicitations below.

Contract NumberProject NameProject DescriptionAdvertise DateAnticipated Advertisement DateDuration
V70PS05Engineering and Project Management Professional Services for Commuter Rail New LocomotiveSupport the MBTA throughout the Car Builder selection process for Commuter Rail New Locomotive Procurement and attend stakeholder meetings, project meetings, site visits, and prepare meeting minutes including relevant evaluations and recommendations.May 30, 2025May 20256 years
Z91PS88-92Systemwide Transit Bus infrastructure Improvement ProgramGECs to provide engineering 0-100% design, bid and CPS services to support systemwide infrastructure improvements aligned with Transit Bus projects and programs, such as bus stops accessibility improvements, bus network redesign, dedicated bus lanes, bus stop shelters and amenities, advanced transit signal priority and new technology, to improve systemwide network efficiency and user experience.June 10, 2025June 20253 years
P09PS01D-Branch Traction Power Upgrades for Increased CapacityUpgrade the traction power infrastructure, overhead contact system (OCS), and underground communication systems along the D-Branch. These upgrades will support the future operation of double Type 10 vehicles and the communication network resiliency.June 5, 2025June 20253 years
X23PS01E Branch Accessibility and Infrastructure ImprovementsImprovement project will upgrade the Green Line E Branch from Brigham Circle to Heath Street stations. Scope includes new accessible stations and station consolidation and the creation of a dedicated transitway for light rail and busses. Additional infrastructure upgrades in the scope include but are not limited to to traction power, overhead contact system, and track.TBDJune 20253 years
Y90PS01Systemwide Pump Room Upgrades DesignProvide design and engineering services for the Systemwide Pump Room Upgrades project. MBTA has identified the need to improve conditions at various pump rooms across the system by implementing improvements related to structural, electrical, architectural, and mechanical systems.TBDJune 20253 years
TBANon-Brooks Act GECsQuality Price Based Selection (QPBS) GECs that do not meet the requirement mandated in the Brooks Act.TBDJune 20253 years
T25PS01Reservoir Lower Yard and Non-Revenue Track Optimization ProjectProject will modify the yard track layout to accommodate new Green Line Type-10 vehicles. Project includes improvements to the site drainage system, new pavement markings, modifications to the overhead catenary system (OCS), new traction power feeds and improvements to the communications infrastructure.TBDJuly 2025TBD
TBDSouth Boston Power Complex StudyFeasibility planning and concept development services for the South Boston Power Complex (SBPC) study, including renewals for the following SBPC assets: 115kV transmission lines; 15kV switching station equipment and facility; high voltage yard components; and 68 MW kerosene-fueled turbine-powered generator (two jet engines). This planning effort will also evaluate the feasibility of alternative scenarios at the site, such as battery storage and upgraded generation systems.TBDJuly 2025TBD