Bidding and Solicitations > Design & Construction > Construction Bid Solicitation

PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975


<<Back to Construction Bid Solicitations

Please review the complete notice to bidders to access the full legal version of this solicitation.

Project NameOverhead Contact System Relocation for Type 10 Vehicles On Call
Project LocationSystemwide, MA
Contract NumberP02CN11
Class1 - GENERAL TRANSIT CONSTRUCTION
Project Value$13,935,767.00

Scope of Work

The work consists of providing construction-related services on an on-call basis to support repair/reconstruction needs of the Authority. Work is anticipated to be performed throughout the MBTA service area and will primarily consist of modifications to the Overhead Catenary System on the Green Line mainlines and Yard areas.

Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.

Send Sealed Bids to:

All bids must be submitted electronically at: www.Bidx.com

Bids Must Be Received By: 01/22/2026 At 2:00 PM

Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Bid Opening Link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA0MDgxMzItNmY3NS00ODIzLTkxYmUtY2I5MTg2MDlkOGE0%40thread.v2/0?context=%7b%22Tid%22%3a%227558e599-f006-481f-9717-b189e6730862%22%2c%22Oid%22%3a%2236fca430-d9fe-4739-a49e-50200dad3d6b%22%7d

Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:

Project ManagerCurley Champion
10 Park Plaza, Boston, MA 02110
Telephone Number857-762-4705
Email Addresscchampion@mbta.com
Pre-Bid Meeting Date & Time **01/08/2026 at 10:00 AM
Pre-Bid Meeting LocationVirtual
Documents Available12/17/2025

*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.