Bidding and Solicitations > Design & Construction > Construction Bid Solicitation

PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975


<<Back to Construction Bid Solicitations

Please review the complete notice to bidders to access the full legal version of this solicitation.

Project NameQuincy Adams Station Vertical Transportation Improvements
Project LocationQuincy, Ma
Contract NumberA90CN10
ClassCLASS 1 – GENERAL TRANSIT CONSTRUCTION AND CLASS 7 – BUILDINGS,
Project Value$7,001,000.00
DBE Goal10%

Scope of Work

Work consists of replacing three (3) obsolete elevators and the construction of a new elevator and hoistway at Quincy Adams station and garage. Work includes removal and replacement of elevators, addition of a new elevator, systems modifications to the elevator machine rooms, and various other improvements to the mechanical, electrical, security and plumbing systems in proximity to the elevators.

Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.

Send Sealed Bids to:

All bids must be submitted electronically at: www.Bidx.com

Bids Must Be Received By: 5/31/2018 At 2:00 PM

Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.

Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:

Project ManagerEric Leguelaff
10 Park Plaza Suite 5170, boston ma, MA 02110
Telephone Number617-222-1668
Email Addresseleguelaff@mbta.com
Site Tour Date & Time*05/17/2018 at 10:00 AM
Site Tour Locationbidders are requested to be present in front of the Quincy Adams Station Garage Elevators at the lobby level
Pre-Bid Meeting Date & Time **05/17/2018 at 10:00 AM
Pre-Bid Meeting LocationQuincy Adams Station in front of the Garage Elevators at the lobby level
Documents Available05/03/2018

*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.